ColoradoProspector   CP Club Membership Info.

Welcome Guest ( Log In | Register )

Sluice design
Davem
post Mar 4 2014, 02:40 PM
Post #1


Diggin' In!
**

Group: Members
Posts: 15
Joined: 26-February 14
Member No.: 116,850



I want to build a sluice box from wood materials. I read one book that used 1 1/2 high riffles (1x2) set 1 1/2" apart. BUT I see all these designs on the internet or commercially made styles where the riffles are set maybe 6" apart. If the wider riffle spacing because expanded metal and carpet is used? I'm not sure what size riffles to use and how far aprt to set them? Thanks for any help.
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
fenixsmom
post Mar 5 2014, 07:04 PM
Post #2


Master Mucker!
*****

Group: Members
Posts: 1,282
Joined: 13-January 14
From: Lakewood, Colorado
Member No.: 116,305



Traddoer knows his stuff so I would listen to him over me. I would make an aluminum one over a wood one any day. The light weight and durability would be my preference personally. If I knew how to weld I would have made my own months ago! The flared feed makes dirt distribution nice and also aids in waterflow..
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 20th July 2025 - 11:51 PM